Post by account_disabled on Jan 8, 2024 5:53:17 GMT 1
C&G' joins in the bid for a new waste incinerator. After the completion of the first electricity generating prototype in Bangkok C&G Company is excited for the bidding results for the 1,000 ton waste incinerator project in Nong Khaem District, confident in its waste disposal and environmental protection results. After successfully operating the first prototype in Bangkok Mr. He Ning, Chief Executive Officer of C&G Environmental Protection (Thailand) Co., Ltd., revealed that the company has participated in bidding for a private contractor project to dispose of solid waste. by the solid waste incinerator system Size not less than 1,000 tons/day at the Nong Khaem Waste Disposal Center, Nong Khaem District, Bangkok (Bangkok) by electronic bidding on January 21, 2019, with the company intending and committed to bringing experience and knowledge in waste disposal. that have been carried out both domestically and abroad to be used in carrying out the said project.
Mr. He said that in the past the C Level Executive List company has been successful in operating a waste disposal plant that produces electricity using an incinerator system, size 300-500 tons/day, at the Nong Khaem Solid Waste Disposal Center. This is the first prototype waste incinerator plant in Bangkok under operation according to the environmental standard system. Ready to promote the quality of life of surrounding people sustainably with modern technology. Mr. He further said that before starting operation of the waste disposal plant, it studied the initial environmental impacts (IEE) and continuously monitored all aspects of environmental quality twice a year. The results of monitoring various aspects of environmental quality Both the air quality in the mass ventilation shaft Ambient air quality, noise levels, surface water quality Groundwater quality All are within the standards specified by law.
However, from more than 3 years of experience in operating a waste disposal plant that produces electricity, the factory has received certification for all 3 work standards: the quality management system standard (ISO 9001), the environmental management system (ISO 14001) and the management system. Occupational Health, Safety, and Working Environment (OHSAS 18001) within just 1 year, even though TOR specifies that the work must be completed within 2 years. This means that the company has personnel with knowledge, abilities, and expertise in Waste disposal work in the incinerator system “It can be confirmed that The operation of our waste-to-energy plants meets standards.
Mr. He said that in the past the C Level Executive List company has been successful in operating a waste disposal plant that produces electricity using an incinerator system, size 300-500 tons/day, at the Nong Khaem Solid Waste Disposal Center. This is the first prototype waste incinerator plant in Bangkok under operation according to the environmental standard system. Ready to promote the quality of life of surrounding people sustainably with modern technology. Mr. He further said that before starting operation of the waste disposal plant, it studied the initial environmental impacts (IEE) and continuously monitored all aspects of environmental quality twice a year. The results of monitoring various aspects of environmental quality Both the air quality in the mass ventilation shaft Ambient air quality, noise levels, surface water quality Groundwater quality All are within the standards specified by law.
However, from more than 3 years of experience in operating a waste disposal plant that produces electricity, the factory has received certification for all 3 work standards: the quality management system standard (ISO 9001), the environmental management system (ISO 14001) and the management system. Occupational Health, Safety, and Working Environment (OHSAS 18001) within just 1 year, even though TOR specifies that the work must be completed within 2 years. This means that the company has personnel with knowledge, abilities, and expertise in Waste disposal work in the incinerator system “It can be confirmed that The operation of our waste-to-energy plants meets standards.